Kind of a big deal

I had a local engineer spline up and flange some axles against samples out of Dons '42 that is full floating already.  After a couple of teething issues (and the standard bit of assistance from Don) they're in and the whole drive train is now sealed.  In fact there's nothing really stopping us from going for a cruise in it apart from bleeding up the brakes.





I hope to take the body tub home from the workshop to strip and prime it in the next couple of weeks.  The only other big job I can think of apart from panel and paint is the roll cage.  That'll be done before it goes green as I'm sure there will be some scratching involved while we sort that.
Sort of coming around on to the home straight.  Exciting stuff!

Comments

Popular posts from this blog

It's been a while

Wainui Willys Works Camp Trailer Mark 4

It's been a while